№ | Слайд | Текст |
1 |
 |
SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS |
2 |
 |
SATURN – GAS TURBINES PRODUCT LINE? , % 35-39% 38-44% 32-36% 35% >85% 25 MW 16 MW GCS Fuel: associated gas, natural gas, synthesis gas; ? diesel fuel, kerosene. 28% >75% >85% 42-46% Ne, MW 42% - electric efficiency >85% - fuel utilization factor 10 MW 6.3 / 8 MW 4 MW GCS 25 MW 16 MW 12 MW GS GTPP 2.5 MW GS GTPP 10 MW 8 MW 6 MW GTPP CCPP GTPP – gas turbine power plant CCPP - combined-cycle power plant GCS – gas compressor set GS - generator set 2 |
3 |
 |
GAS COMPRESSOR SETS 4 – 25 MWGas compressor sets are designed to be used in underground gas storage stations (UGSS) and to transfer gas via pipelines. The units are developed to meet the gas industry latest requirements. Gas compressor sets provide high technical and economical performance values and allow to maintain state-of-the art level of gas transfer capabilities. Gas compressor sets are equipped with remote control system with high protection level and meet all gas industry technical and operational requirements. The units can be designed in two options: outdoor or indoor. 3 |
4 |
 |
GPA-4RM GAS COMPRESSOR SETGTD-4RM (NPO Saturn) - a drive for GPA-4RM Rated power, MW 4.1 Efficiency, % 32.5 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 - 12 Assembly period, months 2 - 3 Fuel gas flow rate at nominal, kg/h 935 4 |
5 |
 |
GPA-6,3/8RM GAS COMPRESSOR SETGTD-6,3/8RM (NPO Saturn) – a drive for GPA-6,3/8RM Rated power, MW 6.3 6.3 / 8 Efficiency, % 32 34.5 Overhaul life expectancy, hours 25 000 25 000 Assigned life expectancy, hours 100 000 100 000 Service life, years 20 20 Delivery period (since contract conclusion), months 9 - 12 9 - 12 Assembly period, months 2 - 3 2 - 3 Fuel gas flow rate at nominal, kg/h 1 435 1 672 5 |
6 |
 |
GPA-10RM GAS COMPRESSOR SETGTD-10RM (NPO Saturn) - a drive for GPA-10RM Rated power, MW 10.2 Efficiency, % 35.5 Overhaul life expectancy, hours 25 000 Assigned life expectancy, hours 100 000 Service life, years 20 Delivery period (since contract conclusion), months 9 - 12 Assembly period, months 2 - 3 Fuel gas flow rate at nominal, kg/h 2 045 6 |
7 |
 |
GPA-16 “ARLAN” GAS COMPRESSOR SETAL-31 ST or PS-90GP2 gas turbine engines may be used as a drive for GPA-16 “Arlan” PS-90GP2 AL-31ST PS-90GP2 AL-31ST Rated power, MW 16 16 Efficiency, % 36.3 35.5 Overhaul life expectancy, hours 25 000 25 000 Assigned life expectancy, hours 100 000 75 000 Service life, years 20 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 - 3 2 - 3 Fuel gas flow rate at nominal, kg/h 3 175 3 305 7 |
8 |
 |
GTN-16R GAS COMPRESSOR SETThis type of gas compressor sets is used for replacement (reconstruction) of obsolete gas pumping equipment as well as for a construction of the new ones. The following drives are used: - PS-90GP2 (Aviadvigatel) - AL-31ST (UMPO) Reconstruction New construction 8 |
9 |
 |
GPA-25 GAS COMPRESSOR SETPS-90GP25 or NK-36ST gas turbine engines may be used as a drive for GPA-25 PS-90GP25 NK-36ST NK-36ST Rated power, MW 25 25 Efficiency, % 37.9 34.5 Overhaul life expectancy, hours 25 000 25 000 Assigned life expectancy, hours 100 000 100 000 Service life, years 20 20 Delivery period (since contract conclusion), months 9 - 12 9 - 12 Assembly period, months 2 - 3 2 - 3 Fuel gas flow rate at nominal, kg/h 4 475 5 231 PS-90GP25 9 |
10 |
 |
GENERATOR SETS AND GAS TURBINE POWER PLANTS 2.5 – 25 MWReliable supply of electric power and heat to the factories and residential areas. High fuel utilization factor reducing power consumption by enterprises by 2 – 2.5 times in comparison with prices from traditional power suppliers. Small overall dimensions of the plant allow to save industrial space. Effective environmental indexes (noise level <80 dB, emission <23ppm) allow to install the plant near the residential areas. Possibility to run on various types of fuel, including: natural gas, associated oil gas, synthetic gas, diesel fuel. 10 |
11 |
 |
GTES-2,5 GAS TURBINE POWER PLANTD049R (NPO Saturn) is a drive for GTES-2,5 Rated power, MW 2.5 Voltage across turbine generator terminals, kV 6.3 / 10.5 Efficiency, % 28,5 Fuel utilization factor (cogeneration), % 74.5 Overhaul life expectancy, hours 20 000 Assigned life expectancy, hours 120 000 Service life, years 20 Delivery period (since contract conclusion), months 11 Assembly period, months 1 Fuel gas flow rate at nominal, kg/h 680 GT upstream fuel gas pressure, MPa 21 – 25 Heat power, Gcal/h 3.87 Plant outline dimensions, m 12.84 х 3.2 х 2.85 11 |
12 |
 |
GTA-6 AND GTA-8 GENERATOR SETSD30KU/KP (NPO Saturn) is a drive for GTA -6/8 GTA-6 GTA-8 Rated power, MW 6.0 8.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 6.3 / 10.5 Indoor option Efficiency, % 25.0 25.8 Fuel utilization factor (cogeneration), % 85.65 92.64 Overhaul life expectancy, hours 30 000 25 000 Assigned life expectancy, hours 120 000 100 000 Service life, years 20 20 Delivery period (since contract conclusion), months 9 - 12 9 - 12 Assembly period, months 2 2 Fuel gas flow rate at nominal, kg/h 1 830 2 382 Heat power, Gcal/h 13,3 17,1 Plant outline dimensions, m 14.6 х 3.6 х 3.8 14.6 х 3.6 х 3.8 Outdoor option 12 |
13 |
 |
GTA-6,3RM AND GTA-8RM GENERATOR SETSGTD-6,3/8RM (NPO Saturn) is a drive for GTA - 6,3RM GTD-6,3RM GTD-6,3/8RM Rated power, MW 6.3 8.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 6.3 / 10.5 Efficiency, % 32.0 33.0 Indoor option Fuel utilization factor (cogeneration), % 75.6 72.0 Overhaul life expectancy, hours 25 000 25 000 Assigned life expectancy, hours 100 000 100 000 Service life, years 20 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 1 419 1 730 Heat power, Gcal/h 7.5 12.68 Plant outline dimensions, m 14.6 х 3.6 х 3.8 14.6 х 3.6 х 3.8 Outdoor option 13 |
14 |
 |
GTA 12 GENERATOR SETPS-90GP and GTE-12S are the drives for GTA-12 GTE-12S PS-90GP PS-90GP GTE-12S Rated power, MW 12 12 Voltage across turbine generator terminals, kV 6.3 / 10.5 6.3 / 10.5 Efficiency, % 33 30,5 Fuel utilization factor (cogeneration), % 83 80 Overhaul life expectancy, hours 30 000 25 000 Assigned life expectancy, hours 120 000 100 000 Service life, years 20 18 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 2 903 2 980 Heat power, Gcal/h 16.6 21.51 Plant outline dimensions, m 14.84 х 3.6 х 3.8 14.84 х 3.6 х 3.8 14 |
15 |
 |
GTA 16 GENERATOR SETPS-90EU16 and AL-31ST are the drives for GTA-16 PS-90EU16 AL-31ST PS-90EU16 AL-31ST Rated power, MW 16.3 16.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 6.3 / 10.5 Efficiency, % 35.5 37 Fuel utilization factor (cogeneration), % 85 85 Overhaul life expectancy, hours 25 000 25 000 Assigned life expectancy, hours 100 000 100 000 Service life, years 20 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 4 746 3 305 Heat power, Gcal/h 20.4 23.5 Plant outline dimensions, m 20.3 х 15.2 х 21 20.3 х 15.2 х 21 15 |
16 |
 |
GTA-25 GENERATOR SETPS-90GP25 NK-37ST PS-90GP25 and NK-37ST are the drives for GTA-25 PS-90GP25 NK-37ST Rated power, MW 22.5 25.0 Voltage across turbine generator terminals, kV 6.3 / 10.5 6.3 / 10.5 Efficiency, % 36.2 34.4 Fuel utilization factor (cogeneration), % 86 86 Overhaul life expectancy, hours 30 000 25 000 Assigned life expectancy, hours 120 000 100 000 Service life, years 21 20 Delivery period (since contract conclusion), months 9 – 12 9 - 12 Assembly period, months 2 – 3 2 - 3 Fuel gas flow rate at nominal, kg/h 4 475 4 994 Heat power, Gcal/h 26.5 31.7 Plant outline dimensions, m 28 х 22.9 х 27.7 28 х 22.9 х 27.7 16 |
17 |
 |
GAS TURBINE EQUIPMENT IN POWER ENGINEERINGPower supply for oil and gas fields, power consuming enterprises and facilities detached from centralized power supply. Reconstruction of obsolete equipment of boiler houses, heat power plants and state district power plants. Installation of new gas turbine equipment enable to increase the fuel utilization factor for more than 80%, thus saving fuel and increasing the quality of power supply. Combined cycle power plants provide heat and electric power to enterprises, utility companies and companies of oil and gas industry. The fuel utilization factor in combined cycle increases by 1.5 times. 17 |
18 |
 |
GTES-6 GAS TURBINE HEAT POWER PLANTMAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-6RM 1 2 Generator 1 3 Air intake and filter unit 1 4 Gas duct 1 5 Whru е-50/3,9-440 1 6 Fire extinguishing system 1 7 Auxiliary switch and control gear 1 8 Switch and control gear 1 9 Control panels 1 18 |
19 |
 |
GTES-12 GAS TURBINE HEAT POWER PLANTMAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-6RM 2 2 Generator 2 3 Air intake and filter unit 2 4 Gas duct 2 5 Whru е-50/3,9-440 2 6 Fire extinguishing system 1 7 Auxiliary switch and control gear 2 8 Switch and control gear 2 9 Control panels 2 19 |
20 |
 |
GTES-16 GAS TURBINE HEAT POWER PLANTMAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-8RM 2 2 Generator 2 3 Air intake and filter unit 2 4 Gas duct 2 5 WHRU E-50/3,9-440 2 6 Fire extinguishing system 1 7 Auxiliary switch and control gear 2 8 Switch and control gear 2 9 Control panels 2 20 |
21 |
 |
PGU-22 COMBINED CYCLE POWER PLANTMAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-8RM 2 2 Generator 2 3 Air intake and filter unit 2 4 Gas duct 2 5 HRSG KGT-10/4,0-440 2 6 Fire extinguishing system 2 7 Steam turbine T-6-4,0/0,18 1 8 Steam turbine generator 1 9 Condenser 1 10 Auxiliary switch and control gear 2 11 Switch and control gear 1 12 Control panels 2 13 Deaerator 2 21 |
22 |
 |
PGU-28 COMBINED CYCLE POWER PLANTMAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-10RM 2 2 Generator 2 3 Air intake and filter unit 2 4 Gas duct 2 5 HRSG KGT-10/4,0-440 2 6 Fire extinguishing system 2 7 Steam turbine T-8-4,0/0,18 1 GTD-10R/RM drive (NPO Saturn) 8 Steam turbine generator 1 9 Condenser 1 10 Auxiliary switch and control gear 2 11 Switch and control gear 1 12 Control panels 2 13 Deaerator 2 22 |
23 |
 |
PGU-32 COMBINED CYCLE POWER PLANTMAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine unit GTU-12P 2 2 Generator TS-12-2 RUHL3 2 3 HRSG KGT-17/4.0-440 2 4 Steam turbine T-8.5/10.2-3.4/0.18 with GTG-8-RUHL3 generator set 1 5 Exhaust duct 2 6 Gearbox 2 23 |
24 |
 |
PGU-52 COMBINED CYCLE POWER PLANTMAIN EQUIPMENT Q-ty, pcs. 1 Gas turbine GTA-8RM 4 2 Generator 4 3 Air intake and filter unit 4 4 Gas duct 4 5 HRSG KGT-20/4,0-440 4 6 Fire extinguishing system 4 7 Steam turbine T-10-4,0/0,18 2 8 Steam turbine generator 2 9 Condenser 1 10 Switch gear 2 11 Auxiliary switch and control gear 2 12 Switch and control gear 1 13 Control panels 2 14 Deaerator 2 24 |
«SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS» |
http://900igr.net/prezentacija/anglijskij-jazyk/saturn-gas-turbines-power-generating-and-gas-compressor-sets-89667.html